Saturday, August 19, 2006

Tub, Radiators and a Bonus



We got a bonus in the cellar when after we decided to hold off on the cellar half bath, the contractor apparently needed to build a wall anyway! Evidently the plumber couldn't run his pipes properly without it. Lucky us.

So we have finally gotten the bedroom floor tub in. This is after the first tub was not worthy. Apparently the 'flange' was not in evidence. The flange that was needed by the contractor to prevent leakage. Which we all know will happen if you don't have the flange. So now we have a flange.




0 Comments:

Post a Comment

<< Home